Browse Items (9774 total)

7 pipe still tower under construction.

7 pipe still tower under construction.

Tank 105 overfilled with floating roof too high.

Thermal cracking unit smokestack, fractionators, from west side.

Thermal cracking unit, smokestack, fractionators, clay towers from west side.

Thermal cracking unit furnace, smokestack, fractionators from west side.

Thermal cracking unit furnace, smokestack, fractionators from west side.

Between 4 Batt SPS and its condenser box looking North to #2 boiler house.

Crude stills 1-2-3-4-5-6-9 from top of 7 PS. #3 boiler house, PFFE redgg stills in background.

View East from #7PS with dismantling of #10-11-12-13-14-15-16-17-18-19 SPS completed. Other Batts remain with thermal cracking unit visible.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2