Browse Items (9583 total)

7 pipe still tower under construction.

7 pipe still tower under construction.

Tank 105 overfilled with floating roof too high.

Thermal cracking unit smokestack, fractionators, from west side.

Thermal cracking unit, smokestack, fractionators, clay towers from west side.

Thermal cracking unit furnace, smokestack, fractionators from west side.

Thermal cracking unit furnace, smokestack, fractionators from west side.

Between 4 Batt SPS and its condenser box looking North to #2 boiler house.

Crude stills 1-2-3-4-5-6-9 from top of 7 PS. #3 boiler house, PFFE redgg stills in background.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2