Browse Items (9489 total)

Crude still gas compression plant.

Piping at tanks 207 and 208 plant 1.

Piping at tanks 207 and 208 plant 1.

Piping at tanks 207 and 208 plant 1.

Piping at tanks 207 and 208 plant 1.

Piping at tanks 207 and 208 plant 1.

Piping at tanks 207 and 208 plant 1.

Looking West toward thermal cracking unit with TTPS in background.

Looking West toward thermal cracking unit with TTPS in background.

No1 plant absorption plant drum collapsed. Note: Photo 362a shows thermal cracking unit in background; but the thermal cracking unit was not built until 1932.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2